Activity
Consultancy and review of the construction project of the steel locks
Description
The project doubles the capacity of the most impressive waterway in the world. Three consecutive navigation basins regulated by four communication ports will allow you to overcome a difference in height of about 26m. As part of this momentous project, Cimolai Spa will build the 16 steel locks (of the “sliding door” type)
Under the constant control of the client, the correspondence between the construction drawings and the calculation documents was verified, compatibly with the feasibility of the project
Utilizzando questo sito web si acconsente all'utilizzo di cookies in conformità alla nostra politica sui cookies. Informazioni OK